Skip to content

Walker Corporation Awards First Stage At Parramatta Square To Built & Obayashi Joint Venture

Walker Corporation has awarded Tier 1 National Contractor Built in a joint venture partnership with Obayashi Corporation (BOJV), the contract to construct Tower 4 at Parramatta Square. Part of the $2.6b Parramatta Square Development, this $400 million tower is the first stage of four commercial towers to be delivered by Walker Corporation.

This iconic and visually striking new commercial building will stand 40 storeys high and offer exceptional views across the city. On completion, Tower 4 will be tallest commercial building outside of Sydney CBD and the largest in the Parramatta Square campus, pending approval of towers 6 and 8. Construction will commence in October of this year, with completion planned for late 2019.

Brett Mason, Managing Director at Built, said, “We are very proud to have been selected with our JV partner Obayashi Corporation to construct this landmark Tower at Parramatta Square and to be involved in one of Australia’s largest transformational CBD rejuvenation projects. We have assembled a highly experienced and passionate team who will bring our strengths in high quality commercial construction and fitout to the fore for this project to position it as an industry leading office tower.”

Property NSW has committed as the anchor tenant of the building, which on completion will house up to 6,000 public servants who will move from a number Sydney CBD locations. The Tower is the largest ever government agency leasing commitment in NSW.

Following the announcement by Property NSW and National Australia Bank’s pre-commitment to Tower 3, there has been strong interest from a number of major ASX publicly listed and private companies that are keen to secure what is the premier location in the heart of Parramatta’s CBD. This growing demand for premium quality A-Grade commercial space in Parramatta’s CBD was the driving force behind the recent proposal to change the use of the Aspire Tower from residential to commercial.

Lang Walker AO, Executive Chairman at Walker Corporation, said, “The Built and Obayashi Joint Venture is a great fit for Walker Corporation and the Parramatta Square project. Both market leaders, their extensive experience in delivering industry leading commercial towers and integrated fit outs was apparent in the teams’ attention to detail of the design, structure and façade of the building.

Mr Walker continued, “Built did a terrific job on the first Tower at Collins Square and we are confident in its ability deliver Tower 4 at Parramatta Square to an industry leading standard in partnership with Obayashi. It was the collective teams’ investment and commitment to the project and their demonstrated understanding of the vision and how best to achieve it that won them the contract.”

This industry leading, mixed-use commercial building will enable Property NSW to establish a dynamic, agile workplace that is well-connected. Employing Walker Corporation’s proven mixed use approach, Tower 4 is surrounded by a breadth of retail, bars, cafes and restaurants that will activate the campus day and night.

Comprising close to 70,000 sq m of office space, the building features some of the largest floorplates in Parramatta CBD, averaging 2,300 sq m. Connected to the wider Parramatta Square precinct and vital infrastructure, Tower 4 will provide access to Tower 6 and 8 Parramatta Square along with the Parramatta train station at ground level.

Ideally positioned above a 3,000sq m retail podium that spills out onto the new Parramatta Square Public Domain, tenants will benefit from a wide selection of eateries, retail and service options to meet their needs. The first seven floors will house the retail precinct, podium floors, childcare centre and shared commercial meeting rooms.

Designed by Johnson Pilton Walker (JPW), the façade is modern and prominent. The internal space offers maximum flexibility and efficiency across floors, providing various options for voids, atriums and inter-connectivity between levels to deliver large open spaces that afford occupants excellent views across the city.

Harnessing the latest in green technology throughout, the building will be built to a minimum 5 Star Green Star As Built Rating in accordance with the Green Building Council of Australia and 5-star NABERS Energy Rating.

Beyond this, environmentally sensitive development practices will be employed to meet the relatively new and stringent WELL Building Standard criteria, to deliver a healthy environment for tenants. This standard measures a buildings’ impact on occupants’ wellbeing and consequently, productivity through a number of initiatives. These include excellent air and water quality, high levels of natural light, flexible working conditions and close proximity to facilities and amenities that promote a healthy and active lifestyle.

4 Parramatta Square is the first of four buildings to be delivered by Walker Corporation, which include Towers 3, 6 and 8 Parramatta Square. Construction of the 42,000sq m 3 Parramatta Square will commence soon after 4 Parramatta Square, having been pre-committed to National Australia Bank. With construction to 6 and 8 Parramatta Square expected to start early 2018. The first two towers will finish consecutively in late 2019 and early 2020 along with the public domain. Towers 6 and 8 will be delivered in 2021.

Back to Updates

Walker Corporation Awards First Stage At Parramatta Square To Built & Obayashi Joint Venture